(c) 2021 Photios G. Ioannou, All rights reserved
CEE536 - Ch 6-1 : Scheduling Arrow Networks
Topics discussed:
- ESDij, EFDij
- Forward Pass
- LSDij, LFDij
- Backward Pass
- Critical Path = Longest Path
- Critical path is made of critical activities with zero floats
- Total Float (TFij)
- Free Float (FFij)
- FFij <= TFij