About SPP
Academics
Careers
Admission
University of Michigan School of Public Policy People
Research
Alumni
Search

Academics
Faculty profiles
MPP program
Combined degree programs

MPA program
PhD program
Ford School courses
U of M Courses of Interest
Academic calendar
Coursetools
PPIA Program
Important links
   

Contact:
Gerald R. Ford
School of Public Policy
440 Lorch Hall,
University of Michigan,
Ann Arbor, MI
48109-1220

734-764-3490 voice
734-763-9181 fax
fordschoolinfo@umich.edu

 

 

Applied Policy Seminar (APS)

The Applied Policy Seminar (APS) is an opportunity for students to act as consultants to state and local governments and community development organizations in Ann Arbor, Detroit, and other areas of Michigan. Projects range widely in policy area, level of quantitative analysis required, size, and complexity. All projects culminate in the publication of a final report and an oral presentation to the client.

Reports of Some Recent APS Projects
These reports are in PDF format and require the free Adobe Acrobat Reader for viewing and/or printing.

An APS Project Close Up: Consulting on the Tiger Stadium Redevelopment Project

Description
In 1997, a consulting firm was retained by the city of Detroit to provide a community-supported recommendation for the City's Request for Proposal for the future of historic Tiger Stadium. Over the next six months, the consulting firm, in conjunction with residents from surrounding neighborhoods and an architectural firm, created threes schemes for the reuse and redevelopment of the stadium. Students from the Gerald R. Ford School of Public Policy, working within Ford School's Applied Policy Seminar, were then asked to assess the economic and financial viability of the three schemes.

Proposals/Schemes
Each of the proposed redevelopment options sought to build on the excellent name recognition and location of Tiger Stadium. The proposals involved different combinations of retail and residential space, and some included area for an athletic fieldhouse. Consistent across all schemes was inclusion of large lofted living spaces. Specifically,

  • Scheme A was a mixed-use scheme that featured exclusively residential and retail components
  • Scheme B consisted of a large athletic complex that focused on fieldhouse and sports related retail
  • Scheme C, the largest of the three schemes, integrated all of the components into an intricate multifaceted facility.

Analysis
In evaluating each scheme, Ford School students performed a detailed analysis that involved the following steps:

  • Determining supply and demand
  • Estimating market rates
  • Comparing the schemes with similar projects and facilities
  • Collecting methods for determining construction costs, expected revenues, and operating expenses
  • Identifying possible externalities and potential variables for analysis
top of page