|
|
|
Applied
Policy Seminar (APS)
The Applied Policy Seminar (APS) is an
opportunity for students to act as consultants to state and local
governments and community development organizations in Ann Arbor,
Detroit, and other areas of Michigan. Projects range widely in
policy area, level of quantitative analysis required, size, and
complexity. All projects culminate in the publication of a final
report and an oral presentation to the client.
Reports of
Some Recent APS Projects
These reports are in PDF format and require the free Adobe
Acrobat Reader for viewing and/or printing.
An APS Project
Close Up: Consulting on the Tiger Stadium Redevelopment Project
Description
In 1997, a consulting firm was retained by the city of
Detroit to provide a community-supported recommendation for the
City's Request for Proposal for the future of historic Tiger Stadium. Over
the next six months, the consulting firm, in conjunction with
residents from surrounding neighborhoods and an architectural
firm, created threes schemes for the reuse and redevelopment of
the stadium. Students from the Gerald R. Ford School of Public
Policy, working within Ford School's Applied Policy Seminar, were
then asked to assess the economic and financial viability of the
three schemes.
Proposals/Schemes
Each of the proposed redevelopment options sought to
build on the excellent name recognition and location of Tiger
Stadium. The proposals involved different combinations of
retail and residential space, and some included area for an athletic
fieldhouse. Consistent across all schemes was inclusion of
large lofted living spaces. Specifically,
- Scheme A was a mixed-use scheme that featured exclusively
residential and retail components
- Scheme B consisted of a large athletic complex that focused
on fieldhouse and sports related retail
- Scheme C, the largest of the three schemes, integrated all
of the components into an intricate multifaceted facility.
Analysis
In evaluating each scheme, Ford School students performed
a detailed analysis that involved the following steps:
- Determining supply and demand
- Estimating market rates
- Comparing the schemes with similar projects and facilities
- Collecting methods for determining construction costs, expected
revenues, and operating expenses
- Identifying possible externalities and potential variables
for analysis
|